Facility: Dubois building in Wrocław
Supplied elements: Ventilating mounting accessories, which serve the purpose of suspending, securing and connecting round and rectangular ventilation ducts and flexible conduits - having the technical recommendation of the Institute of Building Technology (ITB - pol. Instytut Techniki Budowlanej).
Completion date: 2014r.
See the photo gallery for the facility.
Facility: Building of the Parliament of Malta
Components provided: Double-jacket ventilation ducts and profiles made of zinc-coated sheet metal. Both the outer and inner parts of the duct are made of SPIRO pipes with insulation of mineral wool in between. The insulation is 25 to 100-mm thick. The inner part of the profile has an EPDM double gasket to ensure the tightness class D according to EN-12237:2005.
Date of delivery: 2013
See the photo gallery for the facility.
Facility: Volkswagen Polkowice
Supplied elements: Round ventilation ducts and fittings made of acid-resistant metal sheet - 1.4301 1.4301
Completion date: 2013r.
See the photo gallery for the facility.
Facility: Krakowskie Zakłady Wyrobów Papierowych Trefl-Kraków - Niepołomice
Components provided: Components for the installation of rectangular ventilation ducts on roofs. Anti-vibration mats and roof stands ST-ROF-AWL with the possibility to adjust the tilt of a stand in relation to the roof up to 10o. LDB Strut assembly profiles / bars and angle connectors with bolts and nuts for the construction of H-Frame structures.
Date of delivery: 2013
See the photo gallery for the facility.
Facility: Witoldówka, Konstancin Jeziorna
Components provided: Spiro ducts and round profiles made of aluminium for ventilation systems. Highly atypical components of specially selected materials. The internal part of pipes and profiles is made of zinc-coated sheet metal with factory installed gaskets to ensure the highest possible tightness of ventilation systems. Jackets protecting the mineral-wool insulation are made of aluminium sheet. Because of this the entire system looks attractive and benefits from the thermal insulation properties.
Date of delivery: 2010
See the photo gallery for the facility.