Facility: Public building - in-wall recovery heat
Supplied elements: HRU-WALL is a single-tube recuperator equipped with a ceramic exchanger that has a recovery of up to 82%. The energy-saving EC fan alternates every 70 seconds by blowing and extracting air from the room. The intra-wall recovery heat is intended for installation in a single room and can be used both in newly constructed buildings as well as in existing buildings, where it is not possible to install traditional recuperation for architectonic reasons.
Completion date: 2018r.
Facility: Restaurant - Heat and energy recovery ventilators with enthalpy
Supplied elements: The ventilation unit HRU-ERGO with heat recovery and humidity having efficient heat counter, to prevent the dispersion of pollutants into the fresh air. The installation is made in the system equipped with the circular shaped gasket of EPDM rubber, for maintaining the tightness class D by. Eurovent. The round tubes has been suspended on the brackets with rubber shock absorber with a technical recommendation ITB
Completion date: 2015r.
See the photo gallery for the facility.
Facility: Confectionery factory - round duct and fittings made of galvanized steel
Supplied elements: Round ducts and fittings made of galvanized steel to be applied in industry production of confectionery industry
Completion date: 2016r.
See the photo gallery for the facility.
Facility: Construction materials manufacturer - round ventilation ducts and fittings made of aluminium steel
Supplied elements: Round ducts and fittings made of aluminum sheet to be applied in industry production of building materials at the discharge of water vapor from heating equipment.
Completion date: 2016r.
See the photo gallery for the facility.
Facility: Neptun Shopping Mall in Starogard Gdański
Supplied elements: Square and round swirl diffusers intended for low-pressure and medium-pressure ventilation systems, provided with adjustable blades enabling the adjustment of the uniform air flow direction - mounted with the plenum box in the ceiling plane.
Completion date: 2015r.
See the photo gallery for the facility.